Professional Development Program: Delayed Current Zero (DCZ) phenomenon

 

To view complete details for this event, click here to view the announcement

Professional Development Program: Delayed Current Zero (DCZ) phenomenon


Professional Development Program on 

Delayed Current Zero (DCZ) phenomenon associated with Shunt Compensated lines during line energization. Fault clearing - Mitigation methods.


Power & Energy Society of IEEE Hyderabad section in association with Power Grid Corporation of India Limited is organizing this Professional Development Program. Invitation is extended to- practising engineering professionals engaged in power system protection and control, transmission lines, power grid technologies, EHV/HV switchgear testing/projects/operations/maintenance; manufacturers of switchgear/power electronic devices; HV substation design and operation.

Date and Time

Location

  • Seminar Hall, Power Grid Corporation of India Limited
  • Kavadiguda, Secunderabad
  • Hyderabad, Andhra Pradesh
  • India 500080
  • Building: Old Pragna Tools Limited premises
  • Click here for Map
Staticmap?size=250x200&sensor=false&zoom=14&markers=17.4230533%2c78

Contact

Registration

  • No Admission Charge
  • Starts 12 February 2018 08:00 AM
  • Ends 16 February 2018 11:00 AM
  • All times are Asia/Kolkata

Speakers

Pratap Mysore

Pratap Mysore of Pratap Consulting Services

 

Topic:

Delayed Current Zero (DCZ) phenomenon



Agenda

The presentation covers the effect of degree of compensation and point on wave switching on the DCZ phenomenon and discusses various mitigation methods. The presentation also discusses protection and automatic control practices that can be employed to minimize DCZ transient effects, on the equipment, to successfully clear faults.